Piezoelectric composition, piezoelectric element, piezoelectric device, piezoelectric transformer, ultrasonic motor, ultrasonic wave-generating element, and filter element

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12137614
APP PUB NO 20220140226A1
SERIAL NO

17430972

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A piezoelectric composition containing: at least one or more elements selected from alkali metal elements; at least one or more elements selected from a group consisting of vanadium, niobium, and tantalum; copper or copper and germanium; and oxygen. The piezoelectric composition has a main phase, and a high Cu-concentration phase in which a content ratio of copper is higher than the main phase, and when a content ratio of oxygen in the high Cu-concentration phase is set as Og, and a content ratio of copper is set as Cug, Og and Cug satisfy relationships of 51≤Og≤60 and 2.0≤Cug≤15.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TDK CORPORATION2-5-1 NIHONBASHI CHUO-KU TOKYO 103-6128

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Akiyama, Yumi Tokyo, JP 2 0
Katoh, Hiroki Tokyo, JP 15 35

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 5, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00