Power conversion apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12137543
APP PUB NO 20220272877A1
SERIAL NO

17627305

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion apparatus includes: a converter main circuit converting AC power into DC power; an inverter main circuit converting, into AC power, the DC power obtained by conversion by the converter main circuit; and a common cooler cooling first switching elements included in the inverter main circuit and second switching elements included in the converter main circuit. The first switching elements are modularized in units of one or more elements to form first modules. The second switching elements are modularized in units of one or more elements to form second modules. The first and second modules are mounted on a first surface of a base of the cooler. The first modules are arranged in a first direction on the first surface. The second modules are arranged such that two or more second modules are continuously arranged in a second direction orthogonal to the first direction on the first surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakashima, Yukio Tokyo, JP 31 260

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 5, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00