Utility-scale renewable peaker plant, tightly coupled solar PV and energy storage

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12136820
APP PUB NO 20230420947A1
SERIAL NO

18367687

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An exemplary power system includes a DC power bus and a photovoltaic system connected to the DC power bus. An energy storage system is connected to the DC power bus and stores energy injected to the DC power bus by the photovoltaic system. A power inverter is connected to the DC power bus and converts power between the DC power bus and an AC connected load. The power system also includes a control system that receives power system data from one or more sub-systems and devices connected to the DC power bus, and controls, in real-time, one or more of the power inverter and the energy storage system to act as a load on the DC power bus based on the received power system data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • FLUENCE ENERGY, LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cantero, Felipe Boulder, US 5 12
Ley, Samuel Boulder, US 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 5, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00