Cu—Ni—Si-based copper alloy sheet material, method for producing same, and current-carrying component

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12134814
APP PUB NO 20230018758A1
SERIAL NO

17785069

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A copper alloy sheet material having improved etching characteristics contains (in mass %) Ni: 1.00 to 4.50%, Si: 0.10 to 1.40%, and optionally one or more kind of Co, Mg, Cr, P, B, Mn, Sn, Ti, Zr, Al, Fe, Zn, and Ag. The sheet material has an area ratio SB/Ss of 0.40 or more in an EBSD measurement on a cross section perpendicular to a rolling direction, wherein Ss represents area of a region satisfying at least one of conditions of a crystal orientation difference from the S1 {241} <112>orientation of 10° or less or a crystal orientation difference from the S2 {231}<124>orientation of 10° or less, and SB represents an area of a region having a crystal orientation difference from the Brass {011}<211>orientation of 10° or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOWA METALTECH CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hyodo, Hiroshi Tokyo, JP 14 1674
Jiang, Wanqing Tokyo, JP 1 0
Suda, Hisashi Tokyo, JP 18 87
Sugawara, Akira Tokyo, JP 114 1843

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 5, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00