Olefin-based polymer

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12134668
APP PUB NO 20220325018A1
SERIAL NO

17608564

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to an olefin-based polymer satisfying conditions as follow: (1) a melt index (MI, 190° C., 2.16 kg load conditions) is from 0.1 g/10 min to 10.0 g/10 min, (2) a density (d) is from 0.860 g/cc to 0.880 g/cc, and (3) T(90)−T(50)≤50 and T(95)−T(90)≥10 are satisfied when measured by a differential scanning calorimetry precise measurement method (SSA). The olefin-based polymer according to the present invention is a low-density olefin-based polymer introducing a highly crystalline region and showing high mechanical rigidity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG CHEM LTD128 YEOUI-DAERO YEONGDEUNGPO-GU SEOUL 07336

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gong, Jin Sam Daejeon, KR 42 76
Gwak, Rae Keun Daejeon, KR 15 25
Jun, Jung Ho Daejeon, KR 32 70
Kim, Tae Su Daejeon, KR 45 78
Lee, Choong Hoon Daejeon, KR 88 398
Lee, Eun Jung Daejeon, KR 178 412
Park, In Sung Daejeon, KR 45 1411
Park, Sang Eun Daejeon, KR 51 141

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 5, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00