Intermediate bulk container, valve and connector system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12134554
APP PUB NO 20230339739A1
SERIAL NO

18343494

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An intermediate bulk container, valve and connector system is provided that includes a split nut connector. The split nut connector is rotatably mounted on a valve adapter plate which connects with the valve, and is internally threaded for engagement with external threads on the intermediate bulk container outlet. An o-ring seal is aligned and positioned between the adaptor plate inlet and intermediate bulk container outlet by positioning surfaces to provide compression and sealing between the component engaging surfaces, and sealing contact is provided between corresponding surfaces of the components.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ELKHART PLASTICS INC3300 NORTH KENMORE STREET SOUTH BEND IN 46628

International Classification(s)

loading....
  • 2023 Application Filing Year
  • F16K Class
  • 991 Applications Filed
  • 309 Patents Issued To-Date
  • 31.19 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances2023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huston, Charles A Edwardsburg, US 4 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • F16K Class
  • 0 % this patent is cited more than
  • 1 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges18823301 - 10010020030040050060070080090010001100120013001400150016001700180019002000

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 5, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2036