Steam reforming catalysts for sustainable hydrogen production from biobased materials

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12134085
APP PUB NO 20220203341A1
SERIAL NO

17608182

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a steam reforming catalyst for hydrogen production. More specifically, the present invention provides a novel catalysts support for sustainable hydrogen production by steam reforming process using bio-based materials feedstock such as ethanol, glycerol, n-butanol and ethylene glycol. The said improved support catalyst and metal doped catalysts therefrom, are comprising of combination of crystalline Mesoporous cellular foam (MCF) silica and basic site assistant for enhancing catalytic activity of doped active metals thereon and lower coke formation. The benefits of present invention is in the cost efficient steam reforming process for hydrogen production, wherein the said catalysts are efficiently providing a high reactant conversion at lower temperature, no coke formation, high thermal stability for longer time and effective catalytic performance for multiple cycles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YADAV GANAPATI DADASAHEBMUMBAI

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shejale, Ashish Dilip Mumbai, IN 2 0
Yadav, Ganapati Dadasaheb Mumbai, IN 4 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 May 5, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 May 5, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00