Integrated circuit

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12132483
APP PUB NO 20220368316A1
SERIAL NO

17726346

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit for controlling an ignition system including a coil. The integrated circuit includes a transistor configured to control a current flowing through the coil, a first line coupled to a control electrode of the transistor, a second line coupled to an electrode of the transistor on the ground side thereof, a control circuit configured to control on and off of the transistor based on a voltage level of the first line, and a Zener diode having a cathode coupled to the first line and an anode coupled to the second line. The Zener diode has such a capacitance that, when a first signal, and a second signal of a higher frequency, are inputted to the first line, the control circuit controls the on and off of the transistor in response to the first signal irrespective of the second signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJI ELECTRIC CO LTDKAWASAKI-SHI KANAGAWA 210-9530

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Yuya Matsumoto, JP 18 91
Kohama, Takanori Matsumoto, JP 13 51
Nakajima, Hiroyuki Matsumoto, JP 92 711
Nakamura, Hiroshi Matsumoto, JP 877 11765

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00