Aircraft with wireless provision of power

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12132330
APP PUB NO 20230141562A1
SERIAL NO

17912338

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An aircraft has a first antenna arrangement, a payload and a processing unit. The first antenna arrangement is designed to wirelessly receive electromagnetic signals. The processing unit is coupled to the first antenna arrangement, on the one hand, and to the payload, on the other hand. The processing unit is designed to modulate an electromagnetic signal received by the first antenna arrangement and thereby to generate a first modulated signal and to forward it to the payload. The payload is designed to use the first modulated signal as working signal. A radiofrequency power signal on an uplink is thus remodulated into a payload working signal, such that the payload working signal is able to be used directly by the payload without rectification into a DC voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIRBUS DEFENCE AND SPACE GMBHWILLY-MESSERSCHMITT-STRASSE 1 TAUFKIRCHEN 82024

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daniel, Christian Taufkirchen, DE 14 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00