Power cabinet

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12132299
APP PUB NO 20220271515A1
SERIAL NO

17665340

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power cabinet, which includes a cabinet body and an electric reactor, a power unit and a switch arranged in the interior of the cabinet body. In the interior of the cabinet body of the power cabinet, the electric reactor is arranged close to a first side in the interior of the cabinet body, and the power unit and the switch are arranged on a second side in the interior of the cabinet body, opposite to the first side. Moreover, these electric reactor, the power unit and the switch are all located in a lower space. In addition, in the power cabinet, the electric reactor and power unit dissipate heat in different chambers from the switch dissipates heat.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUNGROW POWER SUPPLY CO LTDNO 1699 XIYOU RD NEW & HIGH TECHNOLOGY INDUSTRIAL DEVELOPMENT ZONE HEFEI ANHUI 230088 230088

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sun, Longlin Hefei, CN 6 1
Zheng, Hao Hefei, CN 162 1322
Zhu, Qiyao Hefei, CN 18 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00