Method and device for predicting a switching state and/or a switching time of a signaling system for traffic control

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12131638
APP PUB NO 20220406180A1
SERIAL NO

17638955

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method predicts a switch state and/or a switch time point of a signaling system. The method includes collecting first and second state data, the first and second state data influencing the switch state and/or switch time point. The collection of the first state data includes reading of state data from a signaling system control device of the signaling system by a signaling system interface. The collection of the second state data includes reading in of the state data. A prediction model is provided and configured to make a prediction of the switch time point and/or the switch state of the signaling system based on first and second state data. The switch state and/or the switch time point of the signaling system is predicted via the prediction model using the first and second state data. The predicted switch state and/or switch time point of the signaling system is outputted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YUNEX GMBH81739 MÜNCHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frank, Harald Hoehenkirchen-Siegertsbrunn, DE 8 27
Rudolph, Felix Munich, DE 4 2
Tokic, Michel Tettnang, DE 13 2
von, Beuningen Anja Erfurt, DE 7 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00