Stacked-dies optically bridged multicomponent package

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12130485
SERIAL NO

18610431

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An implementation provides a package that includes a first die including a bridging element, an analog/mixed-signal (AMS) die, and a general die. The first die includes: a first photonic transceiver portion, a first die first interconnect region, and an optical interface (OI). The AMS die includes a second photonic transceiver portion, an AMS die first interconnect region on a first surface of the AMS die electrically and physically coupled with the first die first interconnect region; and an AMS die second interconnect region on a second surface of the AMS die. The general die includes a third photonic transceiver portion, and a general die first interconnect region electrically and physically coupled with the second photonic transceiver portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CELESTIAL AI INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aggarwal, Ankur Pleasanton, US 37 318
Bos, Martinus San Jose, US 23 104
Lazovsky, David Los Gatos, US 16 89
Sahni, Subal La Jolla, US 58 321
Winterbottom, Philip San Jose, US 32 128

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00