Method of multi-zone grouped and light-homogenized Fresnel lens for concentrating system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12130451
SERIAL NO

18755976

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A design method of a multi-zone grouped and light-homogenized Fresnel lens for a concentrating system includes: step 1, designing, according to a basic principle of a Fresnel lens, a planar Fresnel lens; step 2, establishing, according to an optical path characteristic of the concentrating system, an optical path equation of the concentrating system; step 3, determining a differential form of uniform distribution of luminous energy density; and step 4, based on the step 3, calculating design parameters of the multi-zone grouped and light-homogenized Fresnel lens to obtain the multi-zone grouped and light homogenized Fresnel lens. The obtained Fresnel lens can realize low-power concentrating, solve the problem that luminous energy is too concentrated under a high-power light-concentrating ratio, achieve high-uniformity design under different light-concentrating ratios, and improve the light-homogenized performance of the concentrating system, thereby solving non-uniform luminous energy density distribution on a surface of a photovoltaic cell.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIDIAN UNIVERSITY710071 TAIBAI SOUTH ROAD YANTA DISTRICT XI'AN SHAANXI PROVINCE NO 2 XI'AN CITY SHAANXI PROVINCE 710071

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Shimin Xi'an, CN 1 0
Duan, Baoyan Xi'an, CN 3 6
Fan, Guanheng Xi'an, CN 1 0
Liu, Kunpeng Xi'an, CN 222 1068
Wang, Dongxu Xi'an, CN 17 134
Zhang, Yiqun Xi'an, CN 25 60

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00