Radar system and method using priority based routing of radar data

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12130375
APP PUB NO 20230305100A1
SERIAL NO

17705896

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system including a radar receiver and a processor onboard an aircraft. The processor may be configured to: receive or generate weather radar data; identify an end user computing device to receive the weather radar data; determine whether the end user computing device has a high priority or low priority need for the weather radar data; reduce a size and/or an amount of the weather radar data to be a portion of the weather radar data; and upon a determination that the end user computing device has the low priority need for the weather radar data, route, via a datalink, the portion of the weather radar data having the reduced size and/or reduced amount of the weather radar data to the end user computing device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROCKWELL COLLINS INC400 COLLINS ROAD NE LINN BUILDING 105 CEDAR RAPIDS IA 52498

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kronfeld, Kevin M Cedar Rapids, US 40 1155
Sishtla, Venkata A Cedar Rapids, US 40 187

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00