Vertical batch furnace assembly comprising a cooling gas supply

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12130084
APP PUB NO 20230076060A1
SERIAL NO

17986113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vertical batch furnace assembly, comprising a core tube, an outer casing, a cooling chamber bounded and enclosed by the outer casing and the core tube, and at least one cooling gas supply emanating in the cooling chamber. The core tube has an elongated circumferential wall extending in a longitudinal direction, and is configured to accommodate wafers for processing in the vertical batch furnace. The outer casing extends around the core tube and comprises a heating element for applying a thermal treatment to wafers accommodated in the core tube. The at least one cooling gas supply comprises at least one cooling gas supply opening which is arranged such that the cooling gas enters the cooling chamber with a flow direction which is substantially tangent to the circumferential wall.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ASM IP HOLDING B.V.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
de, Ridder Christianus G M Hoogland, NL 7 446
Verbaas, Melvin Gilbert, US 20 1763

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00