Heat exchanger unit and method for manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12130052
APP PUB NO 20210199340A1
SERIAL NO

17131772

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat exchanger unit according to the present disclosure includes a combustion chamber in which a flame caused by a combustion reaction is located, a heat exchanger for a condensing boiler, the heat exchanger being located under the combustion chamber and including heat exchange pipes that receive heat generated by the combustion reaction and heat heating-water flowing through the heat exchange pipes and a main case having the heat exchange pipes accommodated in an interior space thereof, and a combustion chamber heat insulation pipe that is disposed adjacent to the combustion chamber and that receives the heating-water and allows the heating-water to flow therethrough to thermally insulate the combustion chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KYUNGDONG NAVIEN CO LTDGYEONGGI-DO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cho, Sung Cheul Seoul, KR 5 5
Park, Jun Kyu Seoul, KR 104 243

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00