Wire netting, a process and a device for manufacturing the wire netting

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12129618
APP PUB NO 20220267981A1
SERIAL NO

17743107

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hexagonal wire netting, a process for manufacturing such a wire netting and a device for manufacturing a hexagonal wire netting, the device including an assembly of tubes for leading the wires of which every other is twisted into a spiral shape, a spindle assembly and a drum receiving the wire netting, the drum being provided with detent elements. Between each tube leading the spirally twisted wire and the cooperating spindle a straightening guide is located having an inlet opening cooperating with the tube and an outlet opening cooperating with the spindle. The detent elements are arranged on the drum in such a way that the produced wire netting has meshes in which the proportion of the width to the length is less than 0.75.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ODZIOMEK RYSZARD31-136 KRAKÓW

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Odziomek, Ryszard Cracow, PL 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00