Mitigating adverse coastal upwelling effects with an artificial downwelling system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12129616
APP PUB NO 20240084534A1
SERIAL NO

18464113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An artificial downwelling system, for example, can include one or more free-floating, self-propelled, or anchored wave-inertia pumps. In one embodiment, the wave-inertia pumps may be deployed on the oceanic side of an upwelling front. For example, the wave-inertia pump may pump warm surface water to deeper cold layers (e.g., below a sheared pycnocline of upwelling water) to disrupt the coastal upwelling. In some embodiments, a productivity of the artificial downwelling system can be controlled through remote telemetry, telecommand, and/or electromechanical tools. The artificial downwelling system may, for example, be powered by wave energy, and can be controlled using a telemechanical system powered by wind energy, and/or solar panel energy backed by electrical batteries.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOLOVIEV ALEXANDER VHOLLYWOOD FL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Soloviev, Alexander V Hollywood, US 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00