Method of manufacturing concrete products with additives

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12129207
APP PUB NO 20240294432A1
SERIAL NO

18592622

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided a method of manufacturing a concrete product. A composition including a slag-based binder, an aggregate, water and an additive selected from the group consisting of calcium chloride, ground eggshells, sodium carbonate, sodium bicarbonate, sodium hydroxide, fine calcium carbonate, calcium oxide, borax, ammonium chloride and combinations thereof, is mixed to obtain a concrete mixture. The concrete mixture is formed into a desired shape to obtain a formed concrete, the formed concrete having a first water-to-binder ratio. The formed concrete is dried to obtain a dried concrete having a second water-to-binder ratio less than the first water-to-binder ratio. The concrete mixture is carbon cured to obtain the concrete product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • CARBICRETE INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kodippili, Dulani Lachine, CA 2 0
Kumar, Sanoop Laval, CA 3 0
Mahoutian, Mehrdad Montréal, CA 18 22
Martin, Del Campo Jennifer Montréal, CA 2 0
Pal, Shrinwantu Calgary, CA 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00