Preparation method of SSZ-13 zeolite membrane

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12129178
APP PUB NO 20240253998A1
SERIAL NO

18418344

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A preparation method of an SSZ-13 zeolite membrane is provided, and the SSZ-13 zeolite membrane belongs to the technical field of zeolite membranes. The problem that the SSZ-13 zeolite membranes synthesized in the art have a poor quality and a large thickness is solved. A FAU-type zeolite is used as a raw material, and transformed into an SSZ-13 zeolite with a particle size of 210 nm through intergranular transformation, with a mass yield of 91.2%. A crystal seed prepared by the preparation method has a small particle size and a small thickness.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING TECH UNIVERSITY30# (LINKERMAN XUBEI) PUZHU SOUTH ROAD PUKOU DISTRICT NANJING JIANGSU 211816 211816

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bo, Wen Suzhou, CN 1 0
Gu, Xuehong Suzhou, CN 5 9
Peng, Xingyu Suzhou, CN 4 14
Ren, Shengyuan Suzhou, CN 1 0
Wang, Xuerui Suzhou, CN 22 132
You, Lekai Suzhou, CN 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00