Image processing device, imaging control device, radiography system, image processing method, and image processing program

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12127862
APP PUB NO 20220273249A1
SERIAL NO

17591571

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A CPU acquires a projection image group obtained by tomosynthesis imaging in an irradiation angle range wider than an overall imaging irradiation angle range. The CPU generates a plurality of first tomographic images including a part of the breast, using projection images obtained by the tomosynthesis imaging in a first irradiation angle range wider than the overall imaging irradiation angle range, and generates a plurality of second tomographic images including the entire breast, using projection images obtained by the tomosynthesis imaging in a second irradiation angle range that is equal to or narrower than the overall imaging irradiation angle range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIFILM CORPORATIONTOKYO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakayama, Hiroki Kanagawa, JP 137 1218

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00