Shovel

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12127491
SERIAL NO

18658921

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A shovel includes a handgrip and a shaft. The shaft has a proximal end and a distal end, the handgrip is attached to the shaft at the proximal end. The shovel includes an attachment mechanism attached to the shaft at the distal end. The attachment mechanism includes: a housing having an upper portion and a lower portion; and a triggering mechanism located within the housing. The triggering mechanism includes: a hammer spring and a hammer located in the upper portion of the housing, the top portion of the hammer abutting the hammer spring, and the bottom portion of the hammer including a recess. The triggering mechanism also includes a punch pin located in the bottom portion of the housing, the top of the punch pin contacting the bottom of the hammer adjacent to the recess. The triggering mechanism further includes a punch pin spring coiled around the punch pin.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KING SAUD UNIVERSITYPO BOX 2454 RIYADH 11451

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alajaji, Meshal Abdullah Riyadh, SA 1 0
Aldraihem, Osama Jasem Riyadh, SA 1 0
Alsalim, Yazeed Khalid Riyadh, SA 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 29, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 29, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00