Pillar-shaped semiconductor device and method for producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12127385
SERIAL NO

17565738

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In formation of an SRAM cell, a band-shaped contact hole C3 is formed that does not overlap, in plan view. N+ layers 32a, 32c, 32d, and 32f formed on and at outer peripheries of the top portions of Si pillars 6a, 6c, 6d, and 6f, that partly overlaps W layers 33b and 33e on P+ layers 32b and 32e connected to the top portions of Si pillars 6b and 6e, that is connected in both the X direction and the Y direction, and that extends in the Y direction. A power supply wiring metal layer Vdd that connects the P+ layers 32b and 32e through the contact hole C3 is formed. After formation of the power supply wiring metal layer Vdd, a word wiring metal layer WL is formed so as to be orthogonal to the power supply wiring metal layer Vdd in plan view.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNISANTIS ELECTRONICS SINGAPORE PTE LTDSINGAPORE 179098

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harada, Nozomu Tokyo, JP 261 1653
Masuoka, Fujio Tokyo, JP 412 6771

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00