User equipment and methods of bearer operation for carrier aggregation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12127241
APP PUB NO 20230309137A1
SERIAL NO

18202682

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Embodiments of a User Equipment (UE) to support dual-connectivity with a Master Evolved Node-B (MeNB) and a Secondary eNB (SeNB) are disclosed herein. The UE may receive downlink traffic packets from the MeNB and from the SeNB as part of a split data radio bearer (DRB). At least a portion of control functionality for the split DRB may be performed at each of the MeNB and the SeNB. The UE may receive an uplink eNB indicator for an uplink eNB to which the UE is to transmit uplink traffic packets as part of the split DRB. Based at least partly on the uplink eNB indicator, the UE may transmit uplink traffic packets to the uplink eNB as part of the split DRB. The uplink eNB may be selected from a group that includes the MeNB and the SeNB.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLE INCCALIFORNIA USA CALIFORNIA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Heo, Youn Hyoung Seoul, KR 406 10427
Zhang, Yujian Beijing, CN 236 4255

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00