Solar power and energy storage device design for high computational workloads

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12126179
APP PUB NO 20220231512A1
SERIAL NO

17712230

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar power generation system includes a solar component having a power generation capacity of at least C kW for every C kW of a power consumption requirement of a data processing component executing a high computational workload, with the solar component designed for addressing the power consumption requirement of the high computational workload for at least 25% of at least 50% uptime of the data processing component per day. The solar power generation system also includes an energy storage device having a power storage capacity proportionate to the C kW of the power consumption requirement of the data processing component such that the energy storage device is designed to address the power consumption requirement of the high computational workload for a duration within a range of 16% to 75% of the at least 50% uptime of the data processing component per day.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WALSH SEANGRAPEVINE TX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Walsh, Sean San Juan, US 48 597

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00