Incremental solid-fluid countercurrent contacting apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12123439
SERIAL NO

18671719

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A counter-current apparatus uses solid blocks to carry mass or heat storage medium to opposite sides of mass and heat transfer operations. The blocks are pushed incrementally through two channels. The energy of sensible heat or mass of selected species from a first fluid stream transfers into the solid blocks in a first channel and is stored in the solid storage medium within. Those solid blocks loaded with energy or specific mass from the first channel are pushed to a second channel in which the energy or specific mass stored within is released to a second fluid stream. The solid blocks in the second channel are pushed back into the first channel, continuing the heat transfer or mass transfer cycle. Counter-current flows of the fluid phase and the solid phase are achieved in both channels, for a combined adsorption and desorption cycle, or a combined heating and cooling cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZOU BAISHENGSPRING TX

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zou, Baisheng Spring, US 17 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00