Method for controlling a turbomachine comprising an electric machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12123363
APP PUB NO 20230103519A1
SERIAL NO

17905970

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for controlling a turbomachine comprising a gas generator, the turbomachine comprising an electric machine forming a device for injecting torque into/removing torque from one of the low pressure/high pressure rotation shafts of said gas generator. Said method comprises a step of implementing a fuel control loop in order to determine a fuel flow setpoint into the combustion chamber, and comprising, in the event that at least one operability limit is reached, determining a corrected fuel flow setpoint, said corrected fuel flow setpoint exhibiting a difference in relation to the setpoint. Said method also comprises a step of implementing a torque control loop in order to determine a torque setpoint for the electric machine, and comprising determining a torque correction quantity as a function of said difference, said torque setpoint being determined as a function of said torque correction quantity.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRANPARIS FRANCE PARIS PARIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Giannakakis, Panagiotis Moissy-Cramayel, FR 4 1
Jaljal, Nawal Moissy-Cramayel, FR 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00