Geoengineering constructions for use in railways

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12123149
APP PUB NO 20210180262A1
SERIAL NO

16647143

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A railway geogrid construction is suitable for use with high speed trains to mitigate the increased impact of Rayleigh waves generated at high speed and/or over soft subgrades. The construction includes a track bed which defines a track located on a track plane, a mass of particulate material such as an aggregate forming a layer located beneath the track plane, and a geogrid located in and/or below the particulate mass in a geogrid plane substantially parallel to the track plane where the average distance between the track plane and geogrid plane, measured perpendicular to both, is greater than 0.65 metres.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TENSAR TECHNOLOGIES LIMITEDSETT END ROAD WEST SHADSWORTH BUSINESS PARK SHADSWORTH BLACKBURN LANCASHIRE BB1 2PU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horton, Mike Dunblane, GB 18 151

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00