Process for preparing a composite textile article including a biopolymer layer
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Oct 22, 2024
Grant Date -
May 2, 2019
app pub date -
Oct 24, 2018
filing date -
Oct 27, 2017
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Abstract
A process for the production of a composite textile article which includes at least a biopolymer layer, comprising the following steps: providing at least one textile article, in particular selected from a fiber, a yarn, a fabric and a garment; providing at least part of the textile article with at least a biopolymer layer; providing at least part of the biopolymer layer with at least a textile softening agent, to provide a composite textile article; and to a composite textile article as obtainable therefrom.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
SANKO TEKSTIL ISLETMELERI SAN VE TIC A S | 27001 GAZIANTEP |
International Classification(s)

- 2018 Application Filing Year
- D06P Class
- 192 Applications Filed
- 99 Patents Issued To-Date
- 51.57 % Issued To-Date
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Cobanoglu, Ozgur | Bursa, TR | 38 | 71 |
# of filed Patents : 38 Total Citations : 71 | |||
Erkus, Ertug | Bursa, TR | 31 | 73 |
# of filed Patents : 31 Total Citations : 73 | |||
Eryilmaz, Jitka | Bursa, TR | 32 | 43 |
# of filed Patents : 32 Total Citations : 43 | |||
Senel, Ece | Bursa, TR | 10 | 1 |
# of filed Patents : 10 Total Citations : 1 | |||
Zengi, Leyla | Bursa, TR | 12 | 11 |
# of filed Patents : 12 Total Citations : 11 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
- 0 Citation Count
- D06P Class
- 0 % this patent is cited more than
- 1 Age
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
3.5 Year Payment | $1600.00 | $800.00 | $400.00 | Apr 22, 2028 |
7.5 Year Payment | $3600.00 | $1800.00 | $900.00 | Apr 22, 2032 |
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Apr 22, 2036 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 3.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 7.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
Date | Code | Event | Description |
---|---|---|---|
Oct 22, 2024 | P | Publication | |
Oct 02, 2024 | STCF | INFORMATION ON STATUS: PATENT GRANT | free format text: PATENTED CASE |
Sep 20, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Sep 19, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: AWAITING TC RESP, ISSUE FEE PAYMENT VERIFIED |
Aug 28, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: PUBLICATIONS -- ISSUE FEE PAYMENT VERIFIED |
Jun 16, 2024 | ZAAA | NOTICE OF ALLOWANCE AND FEES DUE | free format text: ORIGINAL CODE: NOA |
Jun 12, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS |
May 28, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: AWAITING TC RESP., ISSUE FEE NOT PAID |
May 28, 2024 | ZAAB | NOTICE OF ALLOWANCE MAILED | free format text: ORIGINAL CODE: MN/=. |
May 27, 2024 | ZAAA | NOTICE OF ALLOWANCE AND FEES DUE | free format text: ORIGINAL CODE: NOA |
May 09, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Jan 31, 2024 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Dec 19, 2023 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
May 11, 2023 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: AWAITING RESPONSE FOR INFORMALITY, FEE DEFICIENCY OR CRF ACTION |
Nov 07, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: FINAL REJECTION MAILED |
Aug 09, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Feb 10, 2022 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Sep 16, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Mar 09, 2021 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: FINAL REJECTION MAILED |
Dec 16, 2020 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
Jul 16, 2020 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
Feb 21, 2020 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: NON FINAL ACTION MAILED |
May 02, 2019 | P | Published | |
Mar 20, 2019 | STPP | INFORMATION ON STATUS: PATENT APPLICATION AND GRANTING PROCEDURE IN GENERAL | free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
Feb 07, 2019 | AS | ASSIGNMENT | free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ERYILMAZ, JITKA;ERKUS, ERTUG;COBANOGLU, OZGUR;AND OTHERS;SIGNING DATES FROM 20180122 TO 20181022;REEL/FRAME:048262/0256 Owner name: SANKO TEKSTIL ISLETMELERI SAN. VE TIC. A.S., TURKEY free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:ERYILMAZ, JITKA;ERKUS, ERTUG;COBANOGLU, OZGUR;AND OTHERS;SIGNING DATES FROM 20180122 TO 20181022;REEL/FRAME:048262/0256 Owner name: SANKO TEKSTIL ISLETMELERI SAN. VE TIC. A.S., TURKE |
Oct 24, 2018 | F | Filing | |
Oct 24, 2018 | FEPP | FEE PAYMENT PROCEDURE | free format text: ENTITY STATUS SET TO UNDISCOUNTED (ORIGINAL EVENT CODE: BIG.); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY |
Oct 27, 2017 | PD | Priority Date |

Matter Detail

Renewals Detail
