Method for manufacturing a carpet or a rug and a carpet or rug obtained thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12123121
APP PUB NO 20210071333A1
SERIAL NO

16982409

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Method for manufacturing a carpet or a rug, comprising the following steps: the step (S1-S2) of providing a primary backing (1), being a woven or non-woven layer comprising filaments (2) of polyethyleneterephthalate and copolymer of polyethyleneterephthalate, the coPET having a lower melting temperature than the PET and wherein said PET is available in said primary backing (1) in a higher amount than said coPET; the step of providing a glue layer (11) consisting for 50% or more out of coPET; the step of tufting yarn at least into said primary backing (1); the step of activating said glue layer (11) at least for partially fixing said yarn (12) on said primary backing (1). The invention also concerns carpets (16) and rugs that are obtained or obtainable by means of such method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALADDIN MANUFACTURING CORPORATION160 SOUTH INDUSTRIAL BOULEVARD CALHOUN GA 30701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dye, Mark Gregory Rome, US 2 1
Reynolds, Charles Winston Calhoun, US 5 3
Sethna, Michael Bejon Cohutta, US 7 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00