Polyolefin-polystyrene multi-block copolymer and method for producing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12122905
SERIAL NO

17601577

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A polyolefin-polystyrene multi-block copolymer and a method of producing the same is disclosed herein. In some embodiments, the polyolefin-polystyrene multi-block copolymer has a first complex viscosity of 40,000 Pa·s to 350,000 Pa·s at a temperature of 160° C. and a first frequency of 0.5 rad/s, and has a second complex viscosity of 900 Pa·s to 3,500 Pa·s at a temperature of 160° C. and a second frequency of 125 rad/s. The polyolefin-polystyrene multi-block copolymer has a structure in which polystyrene chains are attached to both ends of a polyolefin chain.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG CHEM LTDSEOUL SOUTH KEREAN SEOUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Im, Seul Ki Daejeon, KR 37 52
Kim, Yun Kon Daejeon, KR 11 7
Lee, Hyun Mo Daejeon, KR 22 34
Lee, Ki Soo Daejeon, KR 131 461
Park, Ji Hyun Daejeon, KR 101 597
Sa, Seok Pil Daejeon, KR 52 95
Shin, Eun Ji Daejeon, KR 66 181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00