System and method to auto-pressurize prior to dispense in a circulation dispense system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12122068
APP PUB NO 20220347888A1
SERIAL NO

17726960

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for generating and dispensing plural component materials includes a controller operatively connected to dispense valves and return valves. The return valves are in respective open states to allow constituent materials to circulate back to a source and are in respective closed states to block circulation. The dispense valves are in respective open states to allow mixing of the constituent materials to form the plural component material and in respective closed states to prevent generation and dispense. The controller implements a delay between closing the return valves and opening the dispense valves to build pressure in the system prior to generating and dispensing the plural component material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GRACO MINNESOTA INC88 11TH AVENUE NE MINNEAPOLIS MN 55413

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Blackson, Christopher R Uniontown, US 4 36

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00