Energy augmentation structures, energy emitters or energy collectors containing the same, and their use in methods and systems for treating cell proliferation disorders

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12121746
SERIAL NO

17433890

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An emission enhancement structure having at least one energy augmentation structure; and an energy converter capable of receiving energy from an energy source, converting the energy and emitting therefrom a light of a different energy than the received energy. The energy converter is disposed in a vicinity of the at least one energy augmentation structure such that the emitted light is emitted with an intensity larger than if the converter were remote from the at least one energy augmentation structure. Also described are various uses for the energy emitters, energy augmentation structures and energy collectors in a wide array of fields, particularly medical uses for treatment of cell proliferation disorders.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMMUNOLIGHT LLC1901 ST ANTOINE ST 6TH FLOOR AT FORD FIELD DETROIT MI 48226

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beyer, Wayne F Detroit, US 19 243
Bourke,, Jr Frederic A Detroit, US 103 1450
Fathi, Zakaryae Detroit, US 123 1909
Rudder, Ronald A Detroit, US 20 734
Simmons, Joseph H Detroit, US 35 927
Walder, Harold Detroit, US 76 1157

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 22, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 22, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00