Integrated power device with energy harvesting gate driver

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12119739
APP PUB NO 20230006539A1
SERIAL NO

17853746

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An electronic circuit is disclosed. The electronic circuit includes a transistor having a gate terminal, a source terminal and a drain terminal, and a gate driver circuit including a pull-down transistor coupled to the gate terminal, and an input terminal arranged to receive an input signal and generate a corresponding output signal at an output terminal coupled to the gate terminal, where the gate driver circuit is arranged to store energy harvested from the input signal and use the stored energy to change a conductive state of the pull-down transistor. In one aspect, the transistor includes gallium nitride (GaN). In another aspect, the pull-down transistor includes GaN.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NAVITAS SEMICONDUCTOR LIMITED22 FITZWILLIAM SQUARE SOUTH SAINT PETER'S DUBLIN D02 FH68

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Giandalia, Marco Marina Del Rey, US 28 321
Jia, Hongwei Aliso Viejo, US 8 13
Kinzer, Daniel M El Segundo, US 142 3679
Zhang, Jason Monterey Park, US 65 1248

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00