Non-oriented electrical steel sheet, production method for non-oriented electrical steel sheet, electric motor and production method for electric motor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12119706
APP PUB NO 20240039347A1
SERIAL NO

18281171

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This non-oriented electrical steel sheet contains a base material having a chemical composition including, in mass %, Si: 3.2 to 4.5%, wherein the tensile strength is 550 MPa or more, and a ratio (P120B/Fe700B)B between a peak-to-peak height Fe700B of Fe at 700 eV and a peak-to-peak height P120B of P at 120 eV when crystal grain boundaries are measured through Auger electron spectroscopy is not more than twice a ratio (P120i/Fe700i)i between a peak-to-peak height Fe700i of Fe at 700 eV and a peak-to-peak height P120i of P at 120 eV when the inside of crystals is measured through Auger electron spectroscopy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuchi, Minako Tokyo, JP 24 8
Natori, Yoshiaki Tokyo, JP 36 46
Takeda, Kazutoshi Tokyo, JP 125 341
Yashiki, Hiroyoshi Tokyo, JP 27 113

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00