Method and Internet of Things system for tidal lane opening management in smart city

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12118882
APP PUB NO 20230419827A1
SERIAL NO

18465147

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for tidal lane opening management in a smart city is provided. The method applied to the management platform includes issuing a data obtaining instruction to a sensor network platform to obtain a first traffic feature of a target road within a first time period from an object platform, wherein the first traffic feature is a feature reflecting a flow situation of the target road, determining a target tidal lane opening scheme of the target road within the first time period based on the first traffic feature using a preset algorithm, generating a scheme execution instruction based on the target tidal lane opening program, sending the scheme execution instruction to the target object through, and issuing a data upload instruction to send the target tidal lane opening scheme to the user platform through a service platform.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHENGDU QINCHUAN IOT TECHNOLOGY CO LTD610100 NO 931 NANSI ROAD JINGKAI DISTRICT LONGQUANYI DISTRICT CHENGDU SICHUAN CHENGDU CITY SICHUAN PROVINCE 610100

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liang, Yongzeng Chengdu, CN 75 28
Liu, Bin Chengdu, CN 1027 7414
Shao, Zehua Chengdu, CN 410 333
Wei, Xiaojun Chengdu, CN 151 102
Xiang, Haitang Chengdu, CN 112 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00