Valve timing detection in fuel system using off cycle sweep

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12116941
SERIAL NO

18228845

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Operating a fuel system for an engine includes moving a plunger during a pumping cycle between an advanced position and a retracted position, and pulsing a solenoid actuator in an electrical circuit during at least one off cycle of the plunger where the plunger is neither advancing nor retracting with a plurality of current pulses of varied duration. An electrical property such as a freewheeling response in the electrical circuit induced by moving a valve in response to each respective current pulse is monitored, and a valve timing of the valve determined based on the monitored electrical property. The fuel system including a fuel injector may be electronically trimmed based on the determined valve timing. Related apparatus and control logic is also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CATERPILLAR INC100 NE ADAMS STREET PEORIA IL 61629-9510

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Juchems, Mitchell B Eureka, US 8 2
Krishnamurthy, Kaushik Manteno, US 1 0
Marrack, Andrew O Peoria, US 13 9
Puckett, Daniel R Peoria, US 34 289

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00