Connection unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12116917
APP PUB NO 20230392530A1
SERIAL NO

18327678

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A connection unit connects an electrical supply line to an exhaust-gas heater of an exhaust system. The connection unit includes a connection element having an electrically conductive connection-element body. The connection element has an exhaust-gas heater connection region in a first axial end region and has a supply-line connection region in a second axial end region. The supply-line connection region includes an end portion of the connection-element body and a radial projection adjoining the end portion. A carrier element fixes the connection unit to an exhaust-system component. The carrier element has a carrier-element opening wherethrough the connection-element body passes. A support unit axially and radially supports the connection element on the carrier element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PUREM GMBH66539 NEUNKIRCHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brenner, Holger Stuttgart, DE 22 23

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00