Hybrid drivetrain, hybrid gearbox, and method for operating same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12115971
APP PUB NO 20220388494A1
SERIAL NO

17774003

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid gearbox has a shift gearbox including at least one fixed ratio gear having a gear ratio both for the internal combustion engine and the electric motor-generator with respect to a power train connection, and speed superposition gearbox which is designed to provide a power-split gear having a variable speed ratio and a fixed torque ratio with respect to the internal combustion engine connection and the power train connection, wherein the variable speed ratio is formed by a modulation of a speed provided by the internal combustion engine on a speed provided by the electric motor-generator. The hybrid gearbox has at least one operating mode in which gear changes are only carried out between the fixed-ratio gear and the power-split gear.

First Claim

See full text

Other Claims data not available

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFTPETUELRING 130 80809 MÜNCHEN 80809

International Classification(s)

loading....
  • 2020 Application Filing Year
  • B60K Class
  • 2682 Applications Filed
  • 1801 Patents Issued To-Date
  • 67.16 % Issued To-Date
Click to zoom InYear of Issuance% of Matters IssuedCumulative IssuancesYearly Issuances2020202120222023202420250255075100

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Liebert, Sebastian Unterfoehring, DE 25 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • 0 Citation Count
  • B60K Class
  • 0 % this patent is cited more than
  • 1 Age
Citation count rangeNumber of patents cited in rangeNumber of patents cited in various citation count ranges10145301 - 10050100150200250300350400450500550600650700750800850900950100010501100

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036