Trailer system for transport of unit load devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12115896
SERIAL NO

18231034

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A trailer system may have a first cargo area having a movable deck. The movable deck may be moved by an actuator. The movable deck may include a plurality of first rollers for engaging and translating cargo. And a movable tailgate may close the first cargo area when it is in a first position. The movable tailgate may have a plurality of second rollers for engaging and translating cargo when the movable tailgate is in a second position. The trailer system may have a plurality of movable decks, where each movable deck is coupled and moved by an actuator. Each actuator may comprise at least one of a hydraulic, pneumatic, and/or electromechanical system. The trailer system may further have a set of lower movable decks and a set of upper movable decks. The set of upper movable decks may be coupled to the lower movable decks by actuators.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COTTRELL INCGAINESVILLE GA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biagi, Gerard Gainesville, US 4 3
Lill, Conner Gainesville, US 2 2
Sexton, Steven Gainesville, US 2 2
Trenbeath, David Gainesville, US 8 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 15, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 15, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00