Signal transfer device, signal transfer method, signal transfer control device, signal transfer control method and signal transfer program

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12114201
APP PUB NO 20220217572A1
SERIAL NO

17429841

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There are included a control unit configured to, when detecting that no high priority traffic frame arrives for a frame interval threshold or longer in the period that allows high priority traffic frames to be transmitted, release the period that allows high priority traffic frames to be transmitted and allocate the released period to the period that allows low priority traffic frames to be transmitted, a frame arrival time information acquisition unit configured to obtain information of frame arrival times of high priority traffic frames, a frame interval calculation unit configured to calculate, in accordance with the information of frame arrival times obtained by the frame arrival time information acquisition unit, frame intervals between frames of the high priority traffic frames input in chronological order, a frame interval threshold calculation unit configured to calculate a new frame interval threshold in accordance with the frame intervals, and a frame interval threshold configuration unit configured to change the frame interval threshold to the new frame interval threshold.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON TELEGRAPH AND TELEPHONE CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukada, Yoichi Musashino, JP 19 20
Shibata, Naotaka Musashino, JP 50 78
Terada, Jun Musashino, JP 62 151
Uzawa, Hiroyuki Musashino, JP 51 81

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00