Mirror with polarizing beam splitter for LIDAR system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12111420
SERIAL NO

16942028

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems, methods, and computer-readable media are disclosed for systems and methods for improved LIDAR return light capture efficiency. One example method may include emitting, by an emitter, a first light pulse in a first path. The example method may also include transmitting, by a polarizing beam splitter in the first path and aligned with an aperture of a reflective element, a portion of the first light pulse, wherein the reflective element is disposed of in the first path. The example method may also include reflecting, by a reflective surface of the reflective element, a second light pulse in a second path, the second light pulse including a return pulse based on the first light pulse being reflected from an object. The example method may also include detecting, by a detector, the detector disposed in the second path of the second light pulse.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG INNOTEK CO LTDSEOUL 07796

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
D'Alo, Richard S San Jose, US 5 3
Davis, Ryan T Woodside, US 12 32
Seghilani, Mohamed S Sunnyvale, US 2 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00