Optimized co-generating system and recovery method for power, water and nitrogen

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12110823
APP PUB NO 20240151180A1
SERIAL NO

18052474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A recovery system includes a special organic Rankine cycle (SORC) system, an internal combustion system, a nitrogen generator and a gas-liquid separator. The SORC system includes a first stage heat exchanger (first HE), a plurality of second stage heat exchangers (second HE), a third stage heat exchanger (third HE), a turbo-expander, and at least one condenser. A recovery method, conducted in the recovery system, includes vaporizing a refrigerant, introducing the vaporized refrigerant to the turbo-expander to generate electricity, condensing the vaporized refrigerant in the at least one condenser, collecting nitrogen from the flue gas feed in the nitrogen generator, and collecting water from the flue gas feed in the gas-liquid separator. The refrigerant is vaporized by introducing the refrigerant through the first HE, second HE and third HE sequentially, and the flue gas feed through the third HE, second HE and first HE sequentially.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY1 EASTERN AVENUE DHAHRAN 31311

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abbas, Ali Mohammad Ank, SA 2 0
Bayat, Hussain M Saihat, SA 2 0
Salu, Samusideen Adewale Ras Tanura, SA 34 165

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00