Method for the combined processing of at least two polymer melts

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12110369
APP PUB NO 20220145013A1
SERIAL NO

17434140

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method for the combined processing of at least two polymer melts selected from the group consisting of (M1), (M2) and (M3), wherein (M1) is a polymer melt comprising a terephthalate polyester (A1), (M2) is a polymer melt comprising a copolyester (A2) on the basis of terephthalic acid, at least one aliphatic, ω-dicarboxylic acid and at least one aliphatic 1,ω-diol, and (M3) is a polymer melt 0 comprising a copolyester (A3) on the basis of terephthalic acid, at least one polytetramethylene glycol and at least one aliphatic 1,ω-diol. The method comprises the alternating processing of the at least two polymer melts into at least one product selected from the group consisting of pellets (P1), fibers (P2), expanded particles (P3), preforms (P4) and articles (P5).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF SELUDWIGSHAFEN GERMANY LUDWIGSHAFEN RHINELAND-PALATINATE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brand, Johann Diedrich Waterloo, BE 5 14
Erbes, Joerg Ludwigshafen, DE 13 42
Heitz, Thomas Ludwigshafen, DE 32 189

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00