Power switching structure

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12110078
SERIAL NO

17515556

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power switching structure includes an input shaft, a detection shaft sleeve fit over the input shaft, an assisting power assembly, and an output assembly selectively drivable by the input shaft and the assisting power assembly. The output assembly includes first and transmission sleeves rotatably mounted to the input shaft. The assisting power assembly includes a power member rotatably mounted to the second transmission sleeve. A one-way bearing is arranged between the first and second transmission sleeves and the power member. An output member is mounted on the second transmission sleeve. A micro-motion static frictional force is induced between the first and second transmission sleeves and the input shaft to allow the detection shaft sleeve to directly and accurately measure a torque value of the input shaft. The one-way bearing arranged between the first and second transmission sleeves and the power member allows for selection among sources of power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YAO LI-HO106 TAIPEI CITY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsieh, Pei-Sheng Taipei, TW 8 0
Lien, Norman Taipei, TW 10 8
Tien, Chi-Chen Taipei, TW 8 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00