Pneumatic tire

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12109845
APP PUB NO 20200189331A1
SERIAL NO

16642516

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a tire structure technology with which sufficient reading performance can be maintained even when a tire having an electronic component provided therein is caused to travel at high speed with severe handling. A pneumatic tire in which an electronic component is provided farther outward in a tire axial direction than a carcass, and in which the E*(1)50° C. at 50° C. and E*(1)150° C. at 150° C. of a first rubber member, and the E*(2)50° C. at 50° C. and E*(2)150° C. at 150° C. of a second rubber member, satisfy the following formula, where the first rubber member is a tire rubber member that has the greatest E* at 50° C. among tire rubber members positioned inward from the electronic component in the tire axial direction, and the second rubber member is a tire rubber member that has the greatest E* at 50° C. among tire rubber members positioned outward from the electronic component in the tire axial direction.

description='In-line Formulae' end='lead'(E*(1)50° C./E*(2)50° C.)−(E*(1)150° C./E*(2)150° C.)≥1.0description='In-line Formulae' end='tail'

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO RUBBER INDUSTRIES LTD6-9 WAKINOHAMA-CHO 3-CHOME CHUO-KU KOBE-SHI HYOGO 6510072 ?6510072

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakajima, Hiroki Hyogo, JP 73 763
Yoshizumi, Takuma Hyogo, JP 13 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00