Acid fracturing hose and preparation method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12109777
SERIAL NO

18699367

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An acid fracturing hose and a preparation method thereof, wherein, the acid fracturing hose includes an inner liner layer, an inner rubber layer, a first buffer layer, a reinforcing layer, a second buffer layer and an outer rubber layer from inside to out in sequence; wherein the inner liner layer is at least one layer of UHMWPE film, the reinforcing layer includes middle rubber layers and steel wire layers that are arranged at intervals, the inner rubber layer and the outer rubber layer are synthetic rubber, and the first buffer layer, the middle rubber layers and the second buffer layer are kiss-coating cord fabrics. The UHMWPE film is used as an inner liner layer, which can be integrated with an inner rubber layer and an outer rubber layer through a high temperature vulcanization process, and the inner liner layer is taken as an inner wall of the hose.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QINGDAO QINGFLEX HOSE FACTORYNO 16 DAYING ROAD DACHANG TOWN HUANGDAO DISTRICT QINGDAO SHANDONG 266414

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Yanqiu Qingdao, CN 13 11
Zhang, Chen Qingdao, CN 745 3564
Zhou, Fan Qingdao, CN 95 655

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00