High corrosion-resistance strip steel and manufacturing method therefor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12109776
APP PUB NO 20220396054A1
SERIAL NO

17790590

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a high corrosion-resistance strip steel and its manufacturing method. The high corrosion-resistance strip steel comprises a carbon steel base layer and a corrosion-resistance cladding layer roll-bonded with the carbon steel base layer, the corrosion-resistance cladding layer being austenitic stainless steel or pure titanium, the thickness of the corrosion-resistance cladding layer being 0.5% to 5% of the total thickness of the strip steel. The high corrosion-resistance strip steel has a high corrosion-resistance surface, good interlayer bonding performance, good mechanical properties and processability.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAOSHAN IRON & STEEL CO LTD201900 NO 885 FUJIN ROAD SHANGHAI BAOSHAN DISTRICT SHANGHAI CITY SHANGHAI CITY 201900

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jiao, Sihai Shanghai, CN 21 17
Yan, Bo Shanghai, CN 118 728

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00