Breast pump movement mitigation brassiere

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12108813
APP PUB NO 20230165318A1
SERIAL NO

17535769

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A brassiere including a brassiere front part including brassier left and right cups adapted to cover the left and right breasts of the brassiere wearer and a left wing and a right wing correspondingly extending from the brassiere left cup and brassiere right cup, the front part defining a brassiere upper edge and a brassiere lower edge connected to a brassiere underband including an brassiere underband adjustor operable to adjust the brassiere underband length to reconfigure the brassiere when breast pumps are positioned between the brassiere wearer breasts and the brassiere wearer side of the brassiere cups to increase pumping efficiency or mitigate movement of breast pumps during expression and collection of breast milk from the brassiere wearer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BURBLE LLC7262 RANGER DRIVE FORT COLLINS CO 80526

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Thompson, Rebecca Ann Fort Collins, US 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 8, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 8, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00