Driving circuit and driving method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12107520
SERIAL NO

17356028

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A driving circuit for driving a piezoelectric load, can include: an energy-storage capacitor; a first power stage circuit configured to convert an input voltage into a first voltage, and to store the first voltage in the energy-storage capacitor; a second power stage circuit configured to receive the first voltage to charge the piezoelectric load during a first operation interval of an operation period, such that a power supply voltage signal provided to the piezoelectric load in the first operation interval corresponds to a reference voltage in a first interval; and a discharging circuit configured to discharge the piezoelectric load during a second operation interval of the operation period, such that the power supply voltage signal in the second operation interval corresponds to the reference voltage in a second interval.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SILERGY SEMICONDUCTOR TECHNOLOGY (HANGZHOU) LTDA1501 TECHNOLOGY MANSION NO 90 WENSAN ROAD HANGZHOU ZHEJIANG PROVINCE 310012

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fang, Chiqing Hangzhou, CN 12 18
Han, Yunlong Hangzhou, CN 19 90
Xu, Zhiwei Hangzhou, CN 97 1075

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00